Complete
2026Fields, footing, and water
Ring and field ground levelled and prepared, with water run to both ends and drainage cut through the low corner. This is the ground the first trials will run on.
The vision
The development is not a rendering of a finished place. It is a sequence of real steps, some already in the ground, some being framed this season, and some still being drawn.
Why this land
The ranch already had what a training and gathering place needs: open ground, long sight lines, mature trees for shade, and enough distance from everything to be quiet. The work is in the details, footing, water, shelter, and rooms that stay cool.
We are building in phases so the land can tell us what it wants. Nothing is finished before it works.
Phases of work
Complete
2026Ring and field ground levelled and prepared, with water run to both ends and drainage cut through the low corner. This is the ground the first trials will run on.
Complete
2026Perimeter paths cut for walking between fields, mature trees kept and watered in, and a gravel approach that keeps vehicles off the working ground.
In progress
Framing this seasonA cedar-framed cover for handlers, crating, and the quiet between runs. Deep eaves for shade, open sides for air, and a floor that hoses down.
Planned
Next phaseSmall, cool rooms for treatment and rest, set back from the fields so the noise of a trial stays where it belongs.
Planned
LaterWarm-water therapy for working and recovering dogs, and a handful of simple rooms so people can stay the weekend rather than drive home tired.
We are talking with trainers, practitioners, and clubs about the first seasons here.